EV Charger Installation In Ealing
We install EV chargers across Ealing and surrounding areas. Whether you’re in a Victorian terrace near Ealing Broadway, a larger Edwardian property off The Avenue or a modern apartment development, we assess the property and your charging requirements before specifying the right equipment for the job. Every installation is designed in line with current regulations, with cables and circuit protection selected to suit the property, and load management configured where required.
EV charger installation across Ealing
Ealing’s housing stock ranges from period terraces and larger detached homes to high-density apartment developments. Installations often involve longer rear garden cable runs, basement flats or routing through shared communal areas.
We review the supply position, earthing arrangement and cable routing before confirming equipment selection. In period properties, careful planning is often required to maintain the appearance of the building while achieving a clean external finish.
Which grants you can use in Ealing
Different schemes from OZEV would apply depending on whether you rent, own a flat or operate a business from your home. All grants require an approved installer, an eligible charger model and, where relevant, a qualifying vehicle.
Renters & Flat Owners Grant
Who qualifies?
Tenants in houses or flats within Ealing with suitable parking
Funding
Up to £350 per socket, capped at 75% of installation cost
Vehicle eligibility
The vehicle must appear on the OZEV eligible vehicle list
On-street option
Cross-pavement solutions supported where on-street parking is the only option
Claim process
The grant is deducted from your invoice and submitted by us
Landlord Chargepoint Grant
Eligibility
Landlord must have a Companies House number or VAT registration
Funding
Up to £350 per socket for houses or flats you let out
Annual limits
Up to 200 residential and 100 commercial grants per financial year
Infrastructure grant
Support available for enabling works and multi-bay upgrades
Claim handling
All evidence submitted through the authorised installer route
Workplace Charging Scheme (WCS)
Funding
Up to £350 per socket, supporting up to 40 sockets per applicant
Home-based companies
Applies where your Ealing home address is registered with Companies House
Use cases
Staff charging, fleet charging and mixed-use commercial premises
Infrastructure grant
Supports cabling, containment and bay preparation
Claim process
Voucher claimed and submitted through the installer route
The installation process in Ealing
Every installation begins with a survey to confirm supply capacity, earthing arrangement and routing method. In managed blocks or conservation areas, this may include written approval before work proceeds.
All installations are notified to the local Distribution Network Operator, and where approval is required, we manage the process before energisation. Once installed, the charger is tested and commissioned in line with current standards.
Survey
Confirm load capacity, routing and compliance requirements
Permissions
Identify landlord or freeholder approval where required
Installation
Install, test and commission to current standards
Grant submission
Submit OZEV evidence where applicable
Frequently Asked Questions
-
Yes. We work across Ealing including Ealing Broadway, North Ealing and surrounding areas.
-
In most cases, no. We normally install a dedicated EV consumer unit with the latest protection requirements, avoiding alterations to the existing board. A fuse box replacement is only discussed if there is a genuine safety issue with the existing unit.
-
This is common in 1930s Harrow homes where garages have been converted. We assess internal routing options, including under-floor access and discreet containment, before recommending an installation method.
-
Yes, subject to parking allocation and managing agent approval.
-
Yes. We install chargers for local businesses and home-registered limited companies under the Workplace Charging Scheme where applicable.
-
Most domestic installations are completed in a single day, depending on cable routing complexity and any additional works required.
-
Yes. Where eligible, we confirm the relevant scheme and submit the required evidence through the authorised installer route.
-
All EV charger installations must be notified to the local Distribution Network Operator and we manage the entire process as part of the installation.
Book your Ealing EV charger survey
If you’re based in Ealing and considering an EV charger, the first step is a structured survey to confirm routing, supply capacity and grant eligibility where applicable.